Green Star project registrations

26 October 2015

ASB Waterfront Theatre

The new ASB Waterfront Theatre is being built in the Wynyard Quarter, on the corner of Maddon and Halsey Street adjacent to the new ASB Building. The building contains spaces that will predominantly be used for the performing arts. There is a main auditorium space where most performing arts events will be held and other spaces that can be used for smaller events. Catering kitchens have been included in the building to serve the events.

Tool: Green Star custom Built

Project location: 138 Halsey Street, Auckland

GSAP: Jo Woods

Project Manager: Cooper and Co

Main Contractor: Hawkins Construction

Architects: Moller Architects

Structural Engineer: BGT Structures

Building Services Engineer: eCubed Building Workshop Ltd

Acoustic Consultants : Marshall Day Acoustics

Quantity Surveryor: Rider Levett Bucknell