Newly registered project

05 March 2019

Waste Management consolidation project,11 Springs Road

The project consists of a mix of Industrial and Office buildings to serve Waste Managements operation. There is a two floor office building and staff amenities of approximately 4,000 sqm and industrial workshops of approximately 4,000 sqm. These sit on a site of 11 ha. The workshops consist of engineering services for Waste Managements trucks and bins.

Tool: Green Star Design & As Built NZ Pilot

Building Owner: Stride Property and Waste Management

GSAP: David Haylock

Project location: 11 Springs Road, East Tamaki

Project manager: RDT Pacific

Architect: Jasmax

Structural engineer/ civil engineer: Holmes

Building services engineer: Cosgroves

Main contractor: Haydn Rollett

Quantity surveyor: Cuesko

Acoustic consultants : Acoustic Engineering Services